18/06/2026
Another groundwork project completed. We carried out the excavation, installed strip foundations to structural engineer specifications, completed the blockwork up to DPC level, prepared the sub-base and drainage, and finished with a reinforced concrete slab ready for the next phase of construction.
Built right from the foundations up.