The Old Signal Hotel Restoration of the hotel is now underway! It's going to take us a while, as we plan to restore her t

16/03/2026

Step 3 of etching the design and fixing the cornice.

16/03/2026

Step 2 of fixing the pressed metal cornice.

16/03/2026

1st step to fixing the hole in the pressed metal cornice!

We had a hole in the pressed metal cornice - couldn’t find a replacement section of it anywhere so the fabulous Glen fix...
16/03/2026

We had a hole in the pressed metal cornice - couldn’t find a replacement section of it anywhere so the fabulous Glen fixed it! He placed a piece of metal behind the cornice from under the floor boards in the room above it, filled the hole with builders bog and plaster, hand drew the cornice pattern on it, then used the Dremel to carve the pattern out. Amazing job and impossible to tell where it was!!

Some progress photos! We have moved downstairs Danny has been stripping paint while Glen has been finishing, painting an...
16/01/2026

Some progress photos! We have moved downstairs Danny has been stripping paint while Glen has been finishing, painting and sanding. Huge job but the stairs and hallway are close to finished. Ow. Photos just don’t do it justice! Oh and we found some of the original paint under the white paint on a couple of doors. We have preserved the old gold lettering.

When doing some other work, we discovered that the lights and PowerPoint wiring to the ground floor is all metal conduit...
15/10/2025

When doing some other work, we discovered that the lights and PowerPoint wiring to the ground floor is all metal conduit and the very old wires. A no brainer in terms of getting it all replaced! Work underway currently which means cutting into the floor boards for access and replacing all of the wiring. It’s a big job, 4 days so far and only about 2/3 done!

Staircase coming to life! 3 solid weeks of sanding and stripping to get to this point! Mostly done by Glen but Danny did...
11/04/2025

Staircase coming to life! 3 solid weeks of sanding and stripping to get to this point! Mostly done by Glen but Danny did chunks of it as well. We are beyond excited! - Added 2 photos as original.

The grand staircase is finally being tackled - stripped of paint and revarnished. Work in progress!!
25/03/2025

The grand staircase is finally being tackled - stripped of paint and revarnished. Work in progress!!

Stage 2! Hardwood flooring replaced with new (and very heavy) hardwood flooring. Replacement of any damaged posts and ba...
18/10/2024

Stage 2! Hardwood flooring replaced with new (and very heavy) hardwood flooring. Replacement of any damaged posts and balustrades next week (all hardwood to match what is remaining). It’s getting exciting!

And finally the repairs to the internal courtyard verandah are under way. Most of the structural hardware is perfect sti...
08/10/2024

And finally the repairs to the internal courtyard verandah are under way. Most of the structural hardware is perfect still, after 100 years, just replacing two support beams with hardwood as well as some of the balustrade. All hardwood as was used back in the day!

Address

85 Single Street
Werris Creek, NSW
2341

Website

Alerts

Be the first to know and let us send you an email when The Old Signal Hotel posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Hotel

Send a message to The Old Signal Hotel:

Shortcuts

Share